Appendix E: Production Go-Live Checklist¶
Security Readiness¶
- iBeta Level 1 certification verified (minimum)
- iBeta Level 2 certification verified (recommended for high-value)
- Internal PAD testing passed across all target PAI species
- Deepfake detection module enabled and tested
- Virtual camera / injection attack defense verified
- Device attestation (SafetyNet/Play Integrity/DeviceCheck) enabled
- Red team exercise completed — all findings addressed
- Adversarial testing performed — model robust
- Penetration test on API endpoints completed
Performance Readiness¶
- APCER < 1% confirmed across all PAI species
- BPCER < 5% confirmed on target device mix
- End-to-end latency P95 < 2 seconds
- Drop-off rate < 10% in pilot testing
- Load testing passed at 2x expected peak volume
- Failover and disaster recovery tested
Compliance Readiness¶
- Data Privacy Impact Assessment (DPIA) completed
- Biometric data consent flow implemented and tested
- Data residency requirements verified
- Audit logging verified — captures all required fields
- Data retention policies configured per regulation
- Regulatory documentation prepared (ISO 30107 compliance evidence)
Operational Readiness¶
- Monitoring dashboards live (APCER, BPCER, latency, volume)
- Alerting configured for anomaly detection
- Manual review queue configured and staffed
- Fallback flows tested (liveness failure → alternative verification)
- Incident response playbook documented and rehearsed
- Support team trained on liveness-related customer issues
- Customer-facing FAQ and help documentation published
Integration Readiness¶
- Face matching pipeline verified end-to-end with liveness
- Session integrity verified (same face used for liveness + matching)
- Anti-replay protection verified
- Frame encryption verified
- Model versioning and rollback capability tested
- A/B testing infrastructure ready for threshold tuning
Business Readiness¶
- Vendor SLA signed with performance guarantees
- Escalation paths documented (vendor, internal, regulatory)
- Customer communication prepared (privacy notice, FAQ)
- Training completed for all stakeholders
- Success metrics defined and tracking enabled
- Post-launch review scheduled (30/60/90 days)